Service Category: Plumbing Design
Library Square (Level 8/9)

The 8th an 9th floors of the existing downtown Library Square building was redeveloped to create a new public gallery and presentation space, in addition to an outdoor gathering area. Combined, levels 8 and 9 offer an additional 42,635 sq. ft. of interior space. Level 8 accommodates a sky-lit double-height… Read more
Dockside Green

Dockside Green is a large-scale LEED Platinum community development project that aims to create a sustainable and mixed-use community. The project is divided into 12 phases, spanning three neighborhoods, and encompasses a total of 1.3 million gross square feet of space. Within these buildings, 73 percent of the area is… Read more
Centennial Secondary School (SD #43)

The new $60M Centennial Secondary School replacement focuses on 21st Century Learning, incorporating and visibly demonstrating sustainable de-sign concepts. It can accommodate 1,250 students, and features a library, amphitheatre, teaching kitchen, metal-shops, automotive and carpentry shops, as well as a 220 seat theatre. Project Scope Rocky Point provided design of… Read more
Western Canada Marine Response (WCMRC) Spill Response Base – Nanaimo

The Western Canada Marine Response Corporation (WCMRC) Nanaimo spill response base was constructed on the Nanaimo Port Authority property and serves as a center for marine response operations during spill events. The $11.2M new building has a two-storey office area and warehouse space, as well as a building equipment storage… Read more
Gold River Hatchery Expansion

This new facility was developed to raise Atlantic Salmon from the fingerling stage to a post smolt size, at which point the fish are released out to water-based grow out facilities. The building is constructed of pre-engineered structural steel framing with solid insulated cladding and an insulated roof. It comprises… Read more
NE Albion Pump Station

The primary objective of the project was to provide a new sanitary pump stations for the new developments in NE Albion, to satisfy new operation requirements, and house a separate electrical service, odor control room, dry well and wet well. The project involved a full new pump station and related… Read more
Abbotsford Christian Middle & Secondary School

Rocky Point Engineering provided mechanical consulting services for this major $20 million expansion to the existing Abbotsford Christian School Campus, providing 21st Century Learning Environments.
Mark Isfeld Secondary School (SD #71) Boiler Plant Upgrade

The boiler plant upgrade will include replacement of existing boiler system with new Viessmann or Cleaver Brooks model high efficiency condensing natural gas boilers to suit a heating capacity of 3,000 MBH. It will also incorporate new primary pumps, primary-secondary pipe distribution in the boiler room, expansion tank, side stream… Read more
Imagine High Integrated Arts and Technology Centre (SD #33)

The project was a major redevelopment of the existing University of the Fraser Valley Education building in which the building and land was purchased by the Chilliwack School District. The existing building was completely renovated and brought up to current standards along with the addition of a new Gymnasium and… Read more
University of Northern BC (Passivhaus Certified / Mass Timber Office Building)

The New Facilities Management Building (FMB) in Prince George, B.C., is a two storey building built to Passive House design standards. The building will be used primarily by the facilities management team as its base of operations. The mechanical innovation showcased in the UNBC FMB Passive House project’s cooling system, when… Read more