The construction project involved building a seismically separated addition on the upper floor of an ambulatory building to house an endoscopy suite and its associated support spaces. Changes were made during the construction phase to include a renovation of the endoscopy MDR area. This involved the installation of new endoscope drying cabinets to improve staff workflow. A new compressed air system was designed to support both the existing medivator and the new scope drying cabinets. The compressed air system was necessary to provide the required airflow and pressure for the drying cabinets to function effectively.
Project Scope:
- Full mechanical design services for plumbing, medical gas, fire protection and HVAC design.